A platform for research: civil engineering, architecture and urbanism
A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
Poshdar, Mani (author) / González, Vicente A. (author) / Raftery, Gary M. (author) / Orozco, Francisco (author) / Cabrera-Guerrero, Guillermo G. (author)
Automation in construction ; 92 ; 46-58
2018-01-01
13 pages
Article (Journal)
English
DDC:
629.8
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules
Online Contents | 2016
|Multi-Objective Optimization of Construction Schedules
British Library Conference Proceedings | 1994
|The method for improving stability of construction project schedules through buffer allocation
BASE | 2011
|