A platform for research: civil engineering, architecture and urbanism
Using Stress Relief Ratio to Delineate Optimal Methane Drainage Zone in Longwall Goaf
Using Stress Relief Ratio to Delineate Optimal Methane Drainage Zone in Longwall Goaf
Using Stress Relief Ratio to Delineate Optimal Methane Drainage Zone in Longwall Goaf
Qu, Qingdong (author) / Guo, Hua (author) / Wilkins, Andy (author)
International Mine Ventilation Congress ; 11. ; 2018 ; Xi'an
2019
Conference paper
English
Bergwerk , Grubengas , Staub , Tunnel , Bergbau , Hitze , Ventilator , Grubenbewetterung , Kühlung
Research on constructing heavy buildings over the longwall goaf
British Library Conference Proceedings | 2004
|Development process and height of the mining-induced water fractured zone over the longwall goaf
DOAJ | 2023
|Hydraulic fracturing applied to inducing longwall coal mine goaf falls
British Library Conference Proceedings | 2000
|Grouting Reinforcement Mechanism and Multimodel Simulation Analysis of Longwall Goaf
DOAJ | 2021
|DOAJ | 2022
|