A platform for research: civil engineering, architecture and urbanism
Optimal Timing for Pavement Maintenance Based on the Relationship between Pre- and Post-Treatment Performance Models
Optimal Timing for Pavement Maintenance Based on the Relationship between Pre- and Post-Treatment Performance Models
Optimal Timing for Pavement Maintenance Based on the Relationship between Pre- and Post-Treatment Performance Models
Dong, Qiao (author) / Chen, Xuegin (author) / Ma, Xiang (author)
International Conference on Transportation and Development ; 2020 ; Seattle, Wash.
2020
Conference paper
English
Effect of Pavement Preventive Maintenance Timing
British Library Conference Proceedings | 1997
|Estimating Optimum Timing for Preventive Maintenance Treatment to Mitigate Pavement Roughness
British Library Online Contents | 2011
|Performance Models for Flexible Pavement Maintenance Treatments
British Library Online Contents | 1995
|