A platform for research: civil engineering, architecture and urbanism
Longitudinal forces in continuously welded rails due to nonlinear track-bridge interaction for loading sequences
Longitudinal forces in continuously welded rails due to nonlinear track-bridge interaction for loading sequences
Longitudinal forces in continuously welded rails due to nonlinear track-bridge interaction for loading sequences
Widarda, Dina Rubiana (author)
2009
VII, VIII, 144 S.
graph. Darst.
Digital preservation by Technische Informationsbibliothek (TIB) / Leibniz-Informationszentrum Technik und Naturwissenschaften und Universitätsbibliothek
Theses
English
UB Braunschweig | 2009
|Managing continuously welded rails the elegant way
British Library Online Contents | 2008
Continuously Welded Rails (CWR) in elevated railway structures
British Library Conference Proceedings | 2003
|