A platform for research: civil engineering, architecture and urbanism
Extending time for constructing bridge over Mississippi River, from East St. Louis, Ill., to St. Louis, Mo. June 7, 1938. -- Referred to the House Calendar and ordered to be printed
Extending time for constructing bridge over Mississippi River, from East St. Louis, Ill., to St. Louis, Mo. June 7, 1938. -- Referred to the House Calendar and ordered to be printed
Extending time for constructing bridge over Mississippi River, from East St. Louis, Ill., to St. Louis, Mo. June 7, 1938. -- Referred to the House Calendar and ordered to be printed
1938
Online-Ressource (3 p)
Campusweiter Zugriff (Universität Hannover) - Vervielfältigungen (z.B. Kopien, Downloads) sind nur von einzelnen Kapiteln oder Seiten und nur zum eigenen wissenschaftlichen Gebrauch erlaubt. Keine Weitergabe an Dritte. Kein systematisches Downloaden durch Robots.
(73) H.R. 7803, Act Authorizing the City of East Saint Louis, Illinois, To Construct, Maintain, and Operate a Toll Bridge across the Mississippi River at or near a Point between Morgan and Wash Streets in the City of Saint Louis, Missouri, and a Point Opposite Thereto in the City of East St. Louis (1934), p. 2
(75) H.R. 5468, Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Mississippi River at or near a Point between Morgan and Wash Streets in the City of Saint Louis, Missouri, and a Point Opposite Thereto in the City of East Saint Louis, Illinois (1935), p. 3
© 2008 by NewsBank, Inc. All rights reserved
Book
Electronic Resource
English