Evaluation and Structural Retrofitting of a Cement Plant Preheater Tower
Inspection by plant personnel revealed cracking in the concrete frame of a 326-ft-tall, 7-level preheater tower. On-site plant engineers deemed the cracking significant, especially since the structure supports critical manufacturing process equipment. A structural engineering consulting firm was retained to evaluate the extent of the problem and formulate a repair plan on a fast-track basis. The firm mobilized at the site in less than 24 hours and performed an initial structural safety assessment. A comprehensive structural evaluation indicated that the structure required strengthening. Restoration consultants were engaged to assist locally with engineering and construction administration. A specialty repair contractor also was engaged to review the constructibility of several alternate repair schemes and maintain the fast-track schedule. After considering structural capacity and serviceability requirements, durability issues, the high-temperature operating environment, constructibility, and an aggressive construction schedule, the team recommended a retrofit consisting of bonded post-tensioning within internal holes drilled in the beams. This solution was quite extraordinary, as it required precision-drilling horizontal holes up to 87 ft long in the beams of the elevated frame structure, without cutting existing embedded reinforcement. Nondestructive impulse radar testing was used to locate existing embedded reinforcing steel, as well as to monitor the drilled holes' trajectory. This process helped ensure proper hole alignment and prevent damage to embedded steel. The cored holes served as post-tensioning ducts. The repairs were executed on a fast track basis and under challenging circumstances, which included working high on the exposed structure through a cold winter with severe wind conditions. The unique retrofit resulted in a structure that is stronger, more serviceable, and more durable than the original tower. The project represented an exceptional team effort, and its success is attributable to the leadership of the owner and client, the ingenuity of the engineering team, and the resourcefullness of the contractor.
Evaluation and Structural Retrofitting of a Cement Plant Preheater Tower
Inspection by plant personnel revealed cracking in the concrete frame of a 326-ft-tall, 7-level preheater tower. On-site plant engineers deemed the cracking significant, especially since the structure supports critical manufacturing process equipment. A structural engineering consulting firm was retained to evaluate the extent of the problem and formulate a repair plan on a fast-track basis. The firm mobilized at the site in less than 24 hours and performed an initial structural safety assessment. A comprehensive structural evaluation indicated that the structure required strengthening. Restoration consultants were engaged to assist locally with engineering and construction administration. A specialty repair contractor also was engaged to review the constructibility of several alternate repair schemes and maintain the fast-track schedule. After considering structural capacity and serviceability requirements, durability issues, the high-temperature operating environment, constructibility, and an aggressive construction schedule, the team recommended a retrofit consisting of bonded post-tensioning within internal holes drilled in the beams. This solution was quite extraordinary, as it required precision-drilling horizontal holes up to 87 ft long in the beams of the elevated frame structure, without cutting existing embedded reinforcement. Nondestructive impulse radar testing was used to locate existing embedded reinforcing steel, as well as to monitor the drilled holes' trajectory. This process helped ensure proper hole alignment and prevent damage to embedded steel. The cored holes served as post-tensioning ducts. The repairs were executed on a fast track basis and under challenging circumstances, which included working high on the exposed structure through a cold winter with severe wind conditions. The unique retrofit resulted in a structure that is stronger, more serviceable, and more durable than the original tower. The project represented an exceptional team effort, and its success is attributable to the leadership of the owner and client, the ingenuity of the engineering team, and the resourcefullness of the contractor.
Evaluation and Structural Retrofitting of a Cement Plant Preheater Tower
Kolf, Peter R. (author) / Oesterle, Ralph G. (author)
Structures Congress 2005 ; 2005 ; New York, New York, United States
Structures Congress 2005 ; 1-11
2005-04-18
Conference paper
Electronic Resource
English
Evaluation and Structural Retrofitting of a Cement Plant Preheater Tower
British Library Conference Proceedings | 2005
|Construction of a preheater tower for a cement plant
Online Contents | 1997
|Cement plant preheater fan build-up control
Tema Archive | 1990
|European Patent Office | 2024
|Air cannons hammer preheater buildup at Nebraska cement plant
British Library Online Contents | 2014
|