A platform for research: civil engineering, architecture and urbanism
Developing a Benchmarking Model for Construction Projects in Hong Kong
This paper attempts to incorporate both leading and lagging KPIs and apply the reliability interval method (RIM) to formulate a benchmarking model to assess project success in Hong Kong. A list of leading and lagging KPIs was complied based on a comprehensive literature review. This list of KPIs was used to develop a survey questionnaire and RIM was subsequently used to analyze the survey results and determine the relative importance and rankings of various leading and lagging KPIs. The results reveal that the top 10 KPIs to evaluate the success of construction projects in Hong Kong (in descending order) were (1) safety performance, (2) cost performance, (3) time performance, (4) quality performance, (5) client’s satisfaction, (6) effectiveness of communication, (7) end user’s satisfaction, (8) effectiveness of planning, (9) functionality, and (10) environmental performance. Finally, a composite performance index (CPI) was derived by means of RIM to provide a comprehensive assessment of construction project success in Hong Kong. Different construction projects can now be assessed on the same basis for benchmarking and project monitoring purposes.
Developing a Benchmarking Model for Construction Projects in Hong Kong
This paper attempts to incorporate both leading and lagging KPIs and apply the reliability interval method (RIM) to formulate a benchmarking model to assess project success in Hong Kong. A list of leading and lagging KPIs was complied based on a comprehensive literature review. This list of KPIs was used to develop a survey questionnaire and RIM was subsequently used to analyze the survey results and determine the relative importance and rankings of various leading and lagging KPIs. The results reveal that the top 10 KPIs to evaluate the success of construction projects in Hong Kong (in descending order) were (1) safety performance, (2) cost performance, (3) time performance, (4) quality performance, (5) client’s satisfaction, (6) effectiveness of communication, (7) end user’s satisfaction, (8) effectiveness of planning, (9) functionality, and (10) environmental performance. Finally, a composite performance index (CPI) was derived by means of RIM to provide a comprehensive assessment of construction project success in Hong Kong. Different construction projects can now be assessed on the same basis for benchmarking and project monitoring purposes.
Developing a Benchmarking Model for Construction Projects in Hong Kong
Yeung, John F. Y. (author) / Chan, Albert P. C. (author) / Chan, Daniel W. M. (author) / Chiang, Y. H. (author) / Yang, Huan (author)
Journal of Construction Engineering and Management ; 139 ; 705-716
2012-07-25
122013-01-01 pages
Article (Journal)
Electronic Resource
English
Developing a Benchmarking Model for Construction Projects in Hong Kong
Online Contents | 2013
|Developing a Benchmarking Model for Construction Projects in Hong Kong
British Library Online Contents | 2013
|Environmental benchmarking of Hong Kong buildings
Online Contents | 2001
|Environmental benchmarking of Hong Kong buildings
Emerald Group Publishing | 2001
|Environmental benchmarking of Hong Kong buildings
British Library Online Contents | 2001
|