A platform for research: civil engineering, architecture and urbanism
Settlement Correction at La Guardia Field
A settlement of about 5 ft in the period prior to August, 1946, permitted sea water to cover parts of the runways at La Guardia Field (New York, N. Y.), thus putting the field out of operation on several occasions. This paper describes the steps, with the field in full operation, t aken to prevent a recurrence of this condition.
Settlement Correction at La Guardia Field
A settlement of about 5 ft in the period prior to August, 1946, permitted sea water to cover parts of the runways at La Guardia Field (New York, N. Y.), thus putting the field out of operation on several occasions. This paper describes the steps, with the field in full operation, t aken to prevent a recurrence of this condition.
Settlement Correction at La Guardia Field
Kyle, John M. (author)
Transactions of the American Society of Civil Engineers ; 116 ; 1343-1348
2021-01-01
61951-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Settlement correction at La Guardia Field
Engineering Index Backfile | 1950
|Closure to “Kyle on La Guardia Field”
ASCE | 2021
|Discussion of “Krynine on La Guardia Field”
ASCE | 2021
|La Guardia Airport Ground-Noise Abatement Study
British Library Online Contents | 1994
|