A platform for research: civil engineering, architecture and urbanism
A chronological narrative of the planning, design, and construction of the bridge that crosses Lake Champlain from Crown Point, N. Y., to Chimney Point, Vt., is given in this paper. After an historical summary outlining the preliminary legislative steps necessary, the subjects of traffic counts, estimates, finances, and proposed toll rates are discussed. A comparison of various types of bridges studied for this crossing and the reasons for adopting the continuous truss type are presented, followed by a description of the finished bridge itself, surveying methods of field location, specifications, loadings, materials, concrete, etc. Construction problems encountered on the substructure and superstructure are treated under separate headings.
A chronological narrative of the planning, design, and construction of the bridge that crosses Lake Champlain from Crown Point, N. Y., to Chimney Point, Vt., is given in this paper. After an historical summary outlining the preliminary legislative steps necessary, the subjects of traffic counts, estimates, finances, and proposed toll rates are discussed. A comparison of various types of bridges studied for this crossing and the reasons for adopting the continuous truss type are presented, followed by a description of the finished bridge itself, surveying methods of field location, specifications, loadings, materials, concrete, etc. Construction problems encountered on the substructure and superstructure are treated under separate headings.
Lake Champlain Bridge
Spofford, Charles M. (author)
Transactions of the American Society of Civil Engineers ; 98 ; 622-653
2021-01-01
321933-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1933
|Engineering Index Backfile | 1931
|Abbet on Lake Champlain Bridge
ASCE | 2021
|