A platform for research: civil engineering, architecture and urbanism
Model-Prototype Conformity: Spillway Coefficients, Norris Dam
The determination of discharge coefficients for the dam spillway crest gates 8a is described in this paper. Actual coefficients calculated for the gates from records of their performance during the flood of January and February, 1937, are compared with the coefficients predicted from tests made on a 1 : 72 scale model by the Bureau of Reclamation. This comparison indicates that the coefficients predicted by the model average 3.9% larger than those actually measured on the dam during this period.
Model-Prototype Conformity: Spillway Coefficients, Norris Dam
The determination of discharge coefficients for the dam spillway crest gates 8a is described in this paper. Actual coefficients calculated for the gates from records of their performance during the flood of January and February, 1937, are compared with the coefficients predicted from tests made on a 1 : 72 scale model by the Bureau of Reclamation. This comparison indicates that the coefficients predicted by the model average 3.9% larger than those actually measured on the dam during this period.
Model-Prototype Conformity: Spillway Coefficients, Norris Dam
Hickox, G. H. (author)
Transactions of the American Society of Civil Engineers ; 109 ; 68-76
2021-01-01
91944-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Conformity between model and prototype tests -- Madden dam spillway
Engineering Index Backfile | 1941
|Spillway tests confirm model-prototype conformance
UB Braunschweig | 1954
|Spillway tests confirm model-prototype conformance
Engineering Index Backfile | 1954
Prototype Spillway Performance Verification
ASCE | 2021
|Discussion on Model-Prototype Conformity
ASCE | 2021
|