A platform for research: civil engineering, architecture and urbanism
Laying the Groundwork
The first phase of a $1-billion downtown redevelopment project required shoring the sides of an excavation the size of a city block by using soil nails, underpinning, diaphragm walls, and jet grouting directly adjacent to several multistory buildings and busy roadways.
Laying the Groundwork
The first phase of a $1-billion downtown redevelopment project required shoring the sides of an excavation the size of a city block by using soil nails, underpinning, diaphragm walls, and jet grouting directly adjacent to several multistory buildings and busy roadways.
Laying the Groundwork
Hurley, Tom (author) / Walker, Mike (author)
Civil Engineering Magazine Archive ; 79 ; 68-85
2016-01-01
182009-01-01 pages
Article (Journal)
Electronic Resource
Unknown
British Library Online Contents | 2009
|British Library Online Contents | 2008
|A SOLID FOUNDATION LAYING THE GROUNDWORK FOR SCHOOL TECHNOLOGY
British Library Online Contents | 2004
British Library Online Contents | 1999
|D6.4 - Laying the Groundwork for Public Acceptance of Enhanced Geothermal Systems
BASE | 2013
|