Selection of Conduit Material for the Provo Reservoir Canal Enclosure Project
In October 2010, the Provo River Water Users Association, which currently operates the 21-mile-long Provo Reservoir Canal (PRC), also known as the Murdock Canal, and the US Bureau of Reclamation, the owner, broke ground for the Provo Reservoir Canal Enclosure Project, a monumental 3-year, $150 million undertaking that will enclose the PRC into a 126-inch steel pipe with the capacity to carry 400 million gallons of water per day. The enclosure of the canal will save approximately 8,000 acre-feet, or 2.6 billion gallons, of water annually from evaporation and seepage, increase safety along the canal's length in areas that are heavily populated, and offer a number of other benefits. When the project was conceived, several materials for the enclosure conduit were considered, including a precast concrete box culverts with gasket joints, cast-in-place concrete box culverts, non-cylinder reinforced concrete pressure pipe, welded steel pressure pipe, and fiberglass reinforced polymer pipe. A systematic analysis of the suitability of each material for the application was conducted, which included availability in the necessary sizes, history of each material in similar applications, hydraulic and other engineering properties, available joint types and the ability of each material to reduce leakage, economic feasibility, and the constructability of each. This paper provides a detailed discussion of each of these parameters from the unbiased viewpoint of the project owner as well as the design engineer.
Selection of Conduit Material for the Provo Reservoir Canal Enclosure Project
In October 2010, the Provo River Water Users Association, which currently operates the 21-mile-long Provo Reservoir Canal (PRC), also known as the Murdock Canal, and the US Bureau of Reclamation, the owner, broke ground for the Provo Reservoir Canal Enclosure Project, a monumental 3-year, $150 million undertaking that will enclose the PRC into a 126-inch steel pipe with the capacity to carry 400 million gallons of water per day. The enclosure of the canal will save approximately 8,000 acre-feet, or 2.6 billion gallons, of water annually from evaporation and seepage, increase safety along the canal's length in areas that are heavily populated, and offer a number of other benefits. When the project was conceived, several materials for the enclosure conduit were considered, including a precast concrete box culverts with gasket joints, cast-in-place concrete box culverts, non-cylinder reinforced concrete pressure pipe, welded steel pressure pipe, and fiberglass reinforced polymer pipe. A systematic analysis of the suitability of each material for the application was conducted, which included availability in the necessary sizes, history of each material in similar applications, hydraulic and other engineering properties, available joint types and the ability of each material to reduce leakage, economic feasibility, and the constructability of each. This paper provides a detailed discussion of each of these parameters from the unbiased viewpoint of the project owner as well as the design engineer.
Selection of Conduit Material for the Provo Reservoir Canal Enclosure Project
Murdock, Adam (author) / Budge, Jeff (author) / Mickelson, Mike (author) / Rahman, Shah (author)
Pipelines Conference 2011 ; 2011 ; Seattle, Washington, United States
Pipelines 2011 ; 1263-1277
2011-07-28
Conference paper
Electronic Resource
English
Earthwork and structures -- Diversion dam -- Weber-Provo diversion canal
Engineering Index Backfile | 1929
Deer creek dam, Provo river project, Utah
Engineering Index Backfile | 1939
|Doubling Provo river irrigation
Engineering Index Backfile | 1945
|Construction Challenges Associated with the Provo Canyon, Utah Widening Project
British Library Conference Proceedings | 2007
|