Exploring Potential Delays Associated with Requests for Information in CM/GC Highway Construction
Requests for information (RFIs) on construction projects facilitate communication between the contractor and the owner or designer. If responses to RFIs are not made promptly, they may cause delays. With alternative project delivery methods like construction manager/general contractor (CM/GC), the contractor participates in the design phase, which provides a much broader understanding of the design. This suggests fewer RFIs for these types of projects compared with the traditional design-bid-build (D-B-B) delivery method. Additionally, projects with alternative delivery methods are frequently on accelerated schedules, which would make them sensitive to RFI response time. Research has not addressed whether or how the CM/GC project delivery method relates to RFI response time, and by corollary, potential project delays. In this research, a simulation of the RFI process was developed using the Simphony simulation software. Probability distributions for RFI creation interval times and RFI response durations were developed from CM/GC highway project data. Preliminary results provide insights into the potential delays due to RFIs. Simulation results on a 3-year CM/GC highway construction project indicate that RFI review delays could potentially generate construction delays up to 10% of the construction duration.
Exploring Potential Delays Associated with Requests for Information in CM/GC Highway Construction
Requests for information (RFIs) on construction projects facilitate communication between the contractor and the owner or designer. If responses to RFIs are not made promptly, they may cause delays. With alternative project delivery methods like construction manager/general contractor (CM/GC), the contractor participates in the design phase, which provides a much broader understanding of the design. This suggests fewer RFIs for these types of projects compared with the traditional design-bid-build (D-B-B) delivery method. Additionally, projects with alternative delivery methods are frequently on accelerated schedules, which would make them sensitive to RFI response time. Research has not addressed whether or how the CM/GC project delivery method relates to RFI response time, and by corollary, potential project delays. In this research, a simulation of the RFI process was developed using the Simphony simulation software. Probability distributions for RFI creation interval times and RFI response durations were developed from CM/GC highway project data. Preliminary results provide insights into the potential delays due to RFIs. Simulation results on a 3-year CM/GC highway construction project indicate that RFI review delays could potentially generate construction delays up to 10% of the construction duration.
Exploring Potential Delays Associated with Requests for Information in CM/GC Highway Construction
Papajohn, Dean (author) / Alleman, Doug (author) / Asmar, Mounir El (author) / Molenaar, Keith (author)
Construction Research Congress 2018 ; 2018 ; New Orleans, Louisiana
Construction Research Congress 2018 ; 640-649
2018-03-29
Conference paper
Electronic Resource
English
Small delays -- Big problem on highway construction jobs
Engineering Index Backfile | 1954
|Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays
British Library Online Contents | 2010
|Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays
Online Contents | 2010
|