A platform for research: civil engineering, architecture and urbanism
Tainter Gate Testing and Evaluation
The Tapoco and Yadkin systems, located in Tennessee and North Carolina, owned and operated by Alcoa have a total of 6 hydroelectric dams, built between 1917 and 1957 with a total of 66 tainter gates similar to the gates at Folsom Dam. The six dams are Santeetlah, Cheoah and Chilhowee on the Tapoco system in Tennnessee and North Carolina and Narrows, Tuckertown and Falls on the Yadkin system in North Carolina. In addition to being very old, gate lubrication practices vary both in the type of grease and frequency of greasing used on each of the projects. To prevent a gate failure similar to the one that occurred at the Bureau of Reclamation Folsom Dam on July 17, 1995, Alcoa retained ECI to inspect, analyze and evaluate the condition and structural capacity of the gates at each of these dams.
Tainter Gate Testing and Evaluation
The Tapoco and Yadkin systems, located in Tennessee and North Carolina, owned and operated by Alcoa have a total of 6 hydroelectric dams, built between 1917 and 1957 with a total of 66 tainter gates similar to the gates at Folsom Dam. The six dams are Santeetlah, Cheoah and Chilhowee on the Tapoco system in Tennnessee and North Carolina and Narrows, Tuckertown and Falls on the Yadkin system in North Carolina. In addition to being very old, gate lubrication practices vary both in the type of grease and frequency of greasing used on each of the projects. To prevent a gate failure similar to the one that occurred at the Bureau of Reclamation Folsom Dam on July 17, 1995, Alcoa retained ECI to inspect, analyze and evaluate the condition and structural capacity of the gates at each of these dams.
Tainter Gate Testing and Evaluation
Hutton, Charles C. (author)
Waterpower Conference 1999 ; 1999 ; Las Vegas, Nevada, United States
Waterpower '99 ; 1-10
1999-07-05
Conference paper
Electronic Resource
English
Tainter Gate Testing and Evaluation
British Library Conference Proceedings | 1998
|Engineering Index Backfile | 1964
|Tainter Gate Testing and Evaluation - Rocky Reach Hydroelectric Project
British Library Conference Proceedings | 2005
|Tainter Gate Operation and Maintenance
British Library Conference Proceedings | 2000
|Olmsted Dam Tainter Gate Design Considerations
ASCE | 2006
|