A platform for research: civil engineering, architecture and urbanism
Underwater Concrete in Drilled Shafts: The Key Issues and Case Histories
In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that high quality concrete can be placed in drilled shafts under water with a proper concrete mix and proper placement techniques. However, a significant number of failures have occurred which have resulted in excessive cost overruns and delays. These problems may have occurred because proper underwater concrete construction techniques have not been widely disseminated within the industry. This is a technical area where competent design and sound construction planning can achieve a significant reduction in both risk and cost. This paper will discuss some key technical issues in the concrete mix design, concrete production and placement for the drilled shaft construction. The paper also describes two lesson-learned case histories from drilled shaft construction projects.
Underwater Concrete in Drilled Shafts: The Key Issues and Case Histories
In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that high quality concrete can be placed in drilled shafts under water with a proper concrete mix and proper placement techniques. However, a significant number of failures have occurred which have resulted in excessive cost overruns and delays. These problems may have occurred because proper underwater concrete construction techniques have not been widely disseminated within the industry. This is a technical area where competent design and sound construction planning can achieve a significant reduction in both risk and cost. This paper will discuss some key technical issues in the concrete mix design, concrete production and placement for the drilled shaft construction. The paper also describes two lesson-learned case histories from drilled shaft construction projects.
Underwater Concrete in Drilled Shafts: The Key Issues and Case Histories
Yao, Sam X. (author) / Bittner, Robert B. (author)
Geo-Denver 2007 ; 2007 ; Denver, Colorado, United States
2007-10-14
Conference paper
Electronic Resource
English
Underwater Concrete in Drilled Shafts: The Key Issues and Case Histories
British Library Conference Proceedings | 2007
|Case histories of Norwegian drilled and blasted shafts in hard rock
British Library Conference Proceedings | 2000
|Attenuating Mass Concrete Effects in Drilled Shafts
NTIS | 2009
|Concrete Temperature Reduction via Voided Drilled Shafts
British Library Conference Proceedings | 2007
|Concrete Temperature Reduction via Voided Drilled Shafts
ASCE | 2007
|