A platform for research: civil engineering, architecture and urbanism
Risk Evaluation of Logistics Park Projects’ Lifecycle during the COVID-19 Pandemic: Failure Mode and Effects Analysis
Logistics parks served as critical logistics facilities during the coronavirus disease 2019 pandemic. Constructing these large-scale projects including their subsequent operations involved unusual risk factors that required comprehensive risk evaluations. Therefore, it is vital to examine the potential risk factors across the entire life cycle of these projects in accordance with the complexity of these large-scale logistics park projects (LLPPs) during the pandemic. This study proposes a new risk analysis model that evaluates a comprehensive list of risk factors based on the failure mode and effects analysis (FMEA). The hesitant uncertain linguistic Z-numbers (HULZNs) and fuzzy C-means (FCM) clustering algorithm are incorporated into the FMEA model to evaluate the risk. The practicability of the model was assessed in a case study. The findings identified and distinguished risk factors based on their levels of influences and priorities in dealing with uncertainties during the decision-making process in LLPPs. The FMEA model’s new methodological assessment also contributes to the efficient risk evaluation process through its more reliable and reasonable failure mode risk clustering, particularly for complex group decision-making environments during the pandemic.
Risk Evaluation of Logistics Park Projects’ Lifecycle during the COVID-19 Pandemic: Failure Mode and Effects Analysis
Logistics parks served as critical logistics facilities during the coronavirus disease 2019 pandemic. Constructing these large-scale projects including their subsequent operations involved unusual risk factors that required comprehensive risk evaluations. Therefore, it is vital to examine the potential risk factors across the entire life cycle of these projects in accordance with the complexity of these large-scale logistics park projects (LLPPs) during the pandemic. This study proposes a new risk analysis model that evaluates a comprehensive list of risk factors based on the failure mode and effects analysis (FMEA). The hesitant uncertain linguistic Z-numbers (HULZNs) and fuzzy C-means (FCM) clustering algorithm are incorporated into the FMEA model to evaluate the risk. The practicability of the model was assessed in a case study. The findings identified and distinguished risk factors based on their levels of influences and priorities in dealing with uncertainties during the decision-making process in LLPPs. The FMEA model’s new methodological assessment also contributes to the efficient risk evaluation process through its more reliable and reasonable failure mode risk clustering, particularly for complex group decision-making environments during the pandemic.
Risk Evaluation of Logistics Park Projects’ Lifecycle during the COVID-19 Pandemic: Failure Mode and Effects Analysis
J. Constr. Eng. Manage.
Liang, Ru (author) / Xue, Zhenzhen (author) / Chong, Heap-Yih (author)
2023-01-01
Article (Journal)
Electronic Resource
English
Impact of the COVID-19 pandemic on risk factors in residential projects
Taylor & Francis Verlag | 2023
|Using Big Data to Assess Park System Performance during the COVID-19 Pandemic
DOAJ | 2023
|Risk Evaluation Model for Construction of a Logistics Park Based on Principal Component Analysis
British Library Conference Proceedings | 2009
|