A platform for research: civil engineering, architecture and urbanism
Advances in Strengthening Existing Prestressed Concrete Cable-Stayed Bridges
More and more engineers have been attracted by the technology for strengthening existing prestressed concrete, cable-stayed bridges. The status and new development of this technology are comprehensively summarized together with the practical experience and achievements of strengthening engineering in recent years in China. The characteristics and realization of the ways of many strengthening techniques are described and future trends for use of these techniques are identified. Engineering application and practice has shown Stay Cable Replacement is a key technique to prolong the service life of an existing prestressed concrete cable-stayed bridge, and External Bonding and Enlarging Cross-section are often adopted in the strengthening projects. Recently developed techniques are Replacement of Closure Segment and Replacement of Tension Rocker Bearing Cables at Subsidiary Piers. Advances in strengthening technology for existing prestressed concrete cable-stayed bridges have important and far-reaching significance in promoting the service level of existing long-span bridges and ensuring their safe and sustainable operation.
Advances in Strengthening Existing Prestressed Concrete Cable-Stayed Bridges
More and more engineers have been attracted by the technology for strengthening existing prestressed concrete, cable-stayed bridges. The status and new development of this technology are comprehensively summarized together with the practical experience and achievements of strengthening engineering in recent years in China. The characteristics and realization of the ways of many strengthening techniques are described and future trends for use of these techniques are identified. Engineering application and practice has shown Stay Cable Replacement is a key technique to prolong the service life of an existing prestressed concrete cable-stayed bridge, and External Bonding and Enlarging Cross-section are often adopted in the strengthening projects. Recently developed techniques are Replacement of Closure Segment and Replacement of Tension Rocker Bearing Cables at Subsidiary Piers. Advances in strengthening technology for existing prestressed concrete cable-stayed bridges have important and far-reaching significance in promoting the service level of existing long-span bridges and ensuring their safe and sustainable operation.
Advances in Strengthening Existing Prestressed Concrete Cable-Stayed Bridges
Li, Hongjiang (author) / Jia, Xuebin (author) / Jiang, Hanwan (author)
14th COTA International Conference of Transportation Professionals ; 2014 ; Changsha, China
CICTP 2014 ; 896-908
2014-06-24
Conference paper
Electronic Resource
English
British Library Conference Proceedings | 2010
|Creep Effects on Prestressed Cable Stayed Bridges
British Library Conference Proceedings | 1997
|Limit Analysis of Prestressed Cable Stayed Bridges
British Library Conference Proceedings | 1997
|Stochastic Analysis of Prestressed Concrete Cable-Stayed Bridges Considering Construction Errors
Trans Tech Publications | 2011
|