A platform for research: civil engineering, architecture and urbanism
Multi-Objective Optimization of Resource Scheduling in Construction Projects
Resource allocation and leveling techniques have been widely used to consider the impact of resource availability and minimize undesirable resource fluctuations. These techniques and existing models deal with two distinct problems in a sequential manner rather than simultaneously. This paper presents the development of a robust multi-objective optimization model for optimizing resource allocation and leveling simultaneously. Two innovative resource leveling metrics, namely Release and Re-Hire (RRH) and Resource Idle Days (RID), are incorporated in the model to directly measure and minimize the negative impact of resource fluctuations on construction productivity and cost. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating optimal tradeoffs between resource utilization efficiency and project duration.
Multi-Objective Optimization of Resource Scheduling in Construction Projects
Resource allocation and leveling techniques have been widely used to consider the impact of resource availability and minimize undesirable resource fluctuations. These techniques and existing models deal with two distinct problems in a sequential manner rather than simultaneously. This paper presents the development of a robust multi-objective optimization model for optimizing resource allocation and leveling simultaneously. Two innovative resource leveling metrics, namely Release and Re-Hire (RRH) and Resource Idle Days (RID), are incorporated in the model to directly measure and minimize the negative impact of resource fluctuations on construction productivity and cost. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating optimal tradeoffs between resource utilization efficiency and project duration.
Multi-Objective Optimization of Resource Scheduling in Construction Projects
Jun, Dho Heon (author) / El-Rayes, Khaled (author)
Construction Research Congress 2009 ; 2009 ; Seattle, Washington, United States
Building a Sustainable Future ; 806-815
2009-04-01
Conference paper
Electronic Resource
English
Multi-Objective Optimization of Resource Scheduling in Construction Projects
British Library Conference Proceedings | 2009
|Multi-Objective Simultaneous Optimization for Linear Projects Scheduling
British Library Conference Proceedings | 2019
|Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
Springer Verlag | 2024
|