A platform for research: civil engineering, architecture and urbanism
Interaction of the Colorado River Project, Texas, with Longshore Sediment Transport
In 1985, a weir jetty system was constructed at the mouth of the Colorado River, Texas, and river discharge was diverted from this mouth in 1992. An evaluation of project impacts on longshore sediment transport was performed to determine the effectiveness of the project at preserving an open, navigable channel while preventing excessive erosion along adjacent beaches. This evaluation included both physical and numerical analysis of pre- and post-project conditions at the Colorado River mouth. Analysis of site data revealed that under the dredging and mechanical bypassing schedule followed during the first 8 years after jetty construction, the project resulted in significant trapping and sorting of sediment transported alongshore. Numerical modeling of the design maintenance dredging plan confirmed the plan to be sufficient for achieving project objectives. However, the entrance channel has continued to shoal considerably more rapidly than was anticipated during the project design.
Interaction of the Colorado River Project, Texas, with Longshore Sediment Transport
In 1985, a weir jetty system was constructed at the mouth of the Colorado River, Texas, and river discharge was diverted from this mouth in 1992. An evaluation of project impacts on longshore sediment transport was performed to determine the effectiveness of the project at preserving an open, navigable channel while preventing excessive erosion along adjacent beaches. This evaluation included both physical and numerical analysis of pre- and post-project conditions at the Colorado River mouth. Analysis of site data revealed that under the dredging and mechanical bypassing schedule followed during the first 8 years after jetty construction, the project resulted in significant trapping and sorting of sediment transported alongshore. Numerical modeling of the design maintenance dredging plan confirmed the plan to be sufficient for achieving project objectives. However, the entrance channel has continued to shoal considerably more rapidly than was anticipated during the project design.
Interaction of the Colorado River Project, Texas, with Longshore Sediment Transport
Heilman, Daniel J. (author) / Edge, Billy L. (author)
25th International Conference on Coastal Engineering ; 1996 ; Orlando, Florida, United States
Coastal Engineering 1996 ; 3309-3322
1997-08-05
Conference paper
Electronic Resource
English
Interaction of the Colorado River Project, Texas, with Longshore Sediment Transport
British Library Conference Proceedings | 1997
|Revisiting Longshore Sediment Transport Formulas
ASCE | 2020
|Longshore Current and Sediment Transport on Beaches
British Library Online Contents | 2007
|Longshore Current and Sediment Transport on Beaches
Online Contents | 2007
|Longshore sediment transport in the swash zone
UB Braunschweig | 1996
|