A platform for research: civil engineering, architecture and urbanism
Influence of Operational Timing on the Efficiency of Venting Turbidity Currents
Reservoir sedimentation is gaining growing attention as dams are aging, due to economic and environmental consequences. Venting of turbidity currents is one of many sediment management techniques, highly recommended when water is in shortage. The venting operation is experimentally investigated using two reservoir bed slopes. The main research questions concern the opening timing of bottom outlets and the duration of venting. The timings tested are relative to the arrival of the current at the outlet. The results showed that in-time venting, synchronized with the arrival of the turbidity current at the outlet, is more efficient than early or late venting. It is recommended to start opening the gates when the turbidity current is around 300 m upstream of the outlet, so that the evacuation is synchronized with the arrival of the current at the dam. Additionally, venting should not be stopped immediately after the end of the turbidity current flow but should instead last for a certain time in order to evacuate the muddy lake depending on the outflow discharge.
Influence of Operational Timing on the Efficiency of Venting Turbidity Currents
Reservoir sedimentation is gaining growing attention as dams are aging, due to economic and environmental consequences. Venting of turbidity currents is one of many sediment management techniques, highly recommended when water is in shortage. The venting operation is experimentally investigated using two reservoir bed slopes. The main research questions concern the opening timing of bottom outlets and the duration of venting. The timings tested are relative to the arrival of the current at the outlet. The results showed that in-time venting, synchronized with the arrival of the turbidity current at the outlet, is more efficient than early or late venting. It is recommended to start opening the gates when the turbidity current is around 300 m upstream of the outlet, so that the evacuation is synchronized with the arrival of the current at the dam. Additionally, venting should not be stopped immediately after the end of the turbidity current flow but should instead last for a certain time in order to evacuate the muddy lake depending on the outflow discharge.
Influence of Operational Timing on the Efficiency of Venting Turbidity Currents
Chamoun, Sabine (author) / De Cesare, Giovanni (author) / Schleiss, Anton J. (author)
2018-07-09
Article (Journal)
Electronic Resource
Unknown
DETERMINATION OF PARAMETERS FOR VENTING TURBIDITY CURRENTS THROUGH A RESERVOIR
British Library Conference Proceedings | 2007
|Venting of turbidity currents approaching a rectangular opening on a horizontal bed
Taylor & Francis Verlag | 2018
|Venting of turbidity currents approaching a rectangular opening on a horizontal bed
British Library Conference Proceedings | 2018
|HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2008
|Role of Ponded Turbidity Currents in Reservoir Trap Efficiency
British Library Online Contents | 2007
|