A platform for research: civil engineering, architecture and urbanism
There are many in the East and South who have only faint ideas regarding the heavy construction being generally carried on by the great transcontinental railway lines in their efforts to reduce grades and straighten alignments; and these slight ideas are usually gathered from brief and incomplete notices appearing at irregular intervals in the daily and technical press. Among others, the Union Pacific Railroad has shown remarkable activity in this direction. Its line has been shortened by many miles, and its grades reduced to a maximum of 0.82 of 1%, compensated 0.03 for each degree of curvature, the maximum curvature allowed being 4 degrees. On all new construction everything is being carried out to a perfect working model.
There are many in the East and South who have only faint ideas regarding the heavy construction being generally carried on by the great transcontinental railway lines in their efforts to reduce grades and straighten alignments; and these slight ideas are usually gathered from brief and incomplete notices appearing at irregular intervals in the daily and technical press. Among others, the Union Pacific Railroad has shown remarkable activity in this direction. Its line has been shortened by many miles, and its grades reduced to a maximum of 0.82 of 1%, compensated 0.03 for each degree of curvature, the maximum curvature allowed being 4 degrees. On all new construction everything is being carried out to a perfect working model.
Heavy Railway Construction in Wyoming
Boggs, J. I. (author)
2021-01-01
161901-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Heavy railway construction in Wyoming
Engineering Index Backfile | 1901
|Heavy railway construction in Wyoming
Engineering Index Backfile | 1901
Discussion on Heavy Railway Construction
ASCE | 2021
|Oiled road construction in Wyoming
Engineering Index Backfile | 1936
|Construction of bituminous surfaces in Wyoming
Engineering Index Backfile | 1936
|