A platform for research: civil engineering, architecture and urbanism
A New Method on Probing and Interpreting Underground Pipeline's Diameter by GPR
The GPR method is always used to locate embedded pipes. However, it is hard to determine their diameters, especially when the underground pipe is full of a lossy medium (as water, oil or gas) in the operation period. This paper first puts forward a new method for probing and interpreting the diameter of underground pipeline filled with the lossy medium. By means of the GPR, the shape of a certain circle can be determined by the coordinates of three points on this circle. Moreover, the operation procedure of this method is listed in detail. Lastly, this method is applied to detect the diameters of the underground pipelines in the model experiment of the actual project. The measurement value is approximately consistent with the real value. This demonstrates that the proposed method achieves good results.
A New Method on Probing and Interpreting Underground Pipeline's Diameter by GPR
The GPR method is always used to locate embedded pipes. However, it is hard to determine their diameters, especially when the underground pipe is full of a lossy medium (as water, oil or gas) in the operation period. This paper first puts forward a new method for probing and interpreting the diameter of underground pipeline filled with the lossy medium. By means of the GPR, the shape of a certain circle can be determined by the coordinates of three points on this circle. Moreover, the operation procedure of this method is listed in detail. Lastly, this method is applied to detect the diameters of the underground pipelines in the model experiment of the actual project. The measurement value is approximately consistent with the real value. This demonstrates that the proposed method achieves good results.
A New Method on Probing and Interpreting Underground Pipeline's Diameter by GPR
Zhang, P. (author) / Muhammat, N. (author)
Geo-Shanghai 2014 ; 2014 ; Shanghai, China
Tunneling and Underground Construction ; 855-861
2014-05-05
Conference paper
Electronic Resource
English
A New Method on Probing and Interpreting an Underground Pipeline's Diameter by GPR
British Library Conference Proceedings | 2014
|Sun Pipeline's Tensioned Cover System Saves Storage Costs
Online Contents | 1996
Keystone Pipeline's CP Journey Spans Three Years, 2,147 Miles
Online Contents | 2011
BP Neural Networks Combinatorial Forecasting Method for Gas Pipeline's Corrosion Rate
British Library Online Contents | 2010
|