A platform for research: civil engineering, architecture and urbanism
The closure of Old River is the crucial feature of the project for flood control and improvement of the lower Mississippi River. This operation involves an initial rock closure, followed by a final hydraulic fill. Geological features and hydraulic characteristics require this procedure in order to provide maximum assurance of positive closure within economical limitations.
The closure of Old River is the crucial feature of the project for flood control and improvement of the lower Mississippi River. This operation involves an initial rock closure, followed by a final hydraulic fill. Geological features and hydraulic characteristics require this procedure in order to provide maximum assurance of positive closure within economical limitations.
Plan for Closure of Old River
Cookson, George M. (author)
Transactions of the American Society of Civil Engineers ; 126 ; 311-330
2021-01-01
201961-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Engineering Index Backfile | 1960
|Single-Shell Tank Closure Work Plan
NTIS | 1996
|Closure to “Horowitz on Zoning Plan”
ASCE | 2021
|Closure to “River Metamorphosis”
ASCE | 2021
|Engineering Index Backfile | 1907
|