A platform for research: civil engineering, architecture and urbanism
Sewer Alignment Complexities in Historic Old Town Temecula
Eastern Municipal Water District (District) needed to increase the wastewater conveyance capabilities of the previously built-out historic commercial area of Old Town Temecula, California. This special water district evaluated several different alignments and construction methods, but with the heavily commercial area being only three blocks wide and dozens long bounded by a freeway on one side and a river on the other, very few options were viable. Several different trenching methods were considered for increasing capacity of the existing collection system. Initially a 36-in. microtunneled casing and carrier pipe was considered, but ultimately replaced with a less expensive option: Auger Boring Method. Once construction started, however, every drive attempt failed. Construction was completed by greatly exceeding the accepted drive lengths of traditional jack-and-bore. This paper describes the tunneling method evaluations and the ultimately successful construction approach.
Sewer Alignment Complexities in Historic Old Town Temecula
Eastern Municipal Water District (District) needed to increase the wastewater conveyance capabilities of the previously built-out historic commercial area of Old Town Temecula, California. This special water district evaluated several different alignments and construction methods, but with the heavily commercial area being only three blocks wide and dozens long bounded by a freeway on one side and a river on the other, very few options were viable. Several different trenching methods were considered for increasing capacity of the existing collection system. Initially a 36-in. microtunneled casing and carrier pipe was considered, but ultimately replaced with a less expensive option: Auger Boring Method. Once construction started, however, every drive attempt failed. Construction was completed by greatly exceeding the accepted drive lengths of traditional jack-and-bore. This paper describes the tunneling method evaluations and the ultimately successful construction approach.
Sewer Alignment Complexities in Historic Old Town Temecula
Friedman, Steven A. (author)
Pipelines 2020 ; 2020 ; San Antonio, Texas (Conference Held Virtually)
Pipelines 2020 ; 549-558
2020-08-06
Conference paper
Electronic Resource
English
Sewer Alignment Complexities in Historic Old Town Temecula
TIBKAT | 2023
|Sewer Alignment Complexities in Historic Old Town Temecula
TIBKAT | 2020
|MELBOURNE MAIN SEWER - Historic Melbourne sewer replacement
Online Contents | 2012
The complexities of managing historic buildings with BIM
Emerald Group Publishing | 2020
|- Historic centre of Lille. Innovation for a main sewer
British Library Online Contents | 2003
|