Factors Affecting Productivity of Horizontal Directional Drilling
Horizontal Directional Drilling (HDD) is a suitable construction method for crossing beneath obstacles, such as rivers and lakes, highways, or special areas such as airport runways. In particular, HDD is the most appropriate, cost effective method for constructing new water and wastewater pipelines where excavation is not practical or possible. HDD operations are capable of traversing various soil conditions and meeting a wide variety of project requirements (pipe size and material, placement distance and depth). Nonetheless, the specific soil conditions and project details are important factors in determining the productivity of the overall operation, and these conditions must therefore be carefully investigated during the HDD design phase. The present case study provides observed HDD productivity values (ft/hr) in different soil formations (shaly clay, sandy shale, and silty clay) based on operations at a single HDD site, serving as a pilot project. In particular, the variation in HDD productivity during the reaming stage is provided based on the soil and project conditions encountered (diameter), while other conditions (e.g., contractor and HDD machine) remain constant.
Factors Affecting Productivity of Horizontal Directional Drilling
Horizontal Directional Drilling (HDD) is a suitable construction method for crossing beneath obstacles, such as rivers and lakes, highways, or special areas such as airport runways. In particular, HDD is the most appropriate, cost effective method for constructing new water and wastewater pipelines where excavation is not practical or possible. HDD operations are capable of traversing various soil conditions and meeting a wide variety of project requirements (pipe size and material, placement distance and depth). Nonetheless, the specific soil conditions and project details are important factors in determining the productivity of the overall operation, and these conditions must therefore be carefully investigated during the HDD design phase. The present case study provides observed HDD productivity values (ft/hr) in different soil formations (shaly clay, sandy shale, and silty clay) based on operations at a single HDD site, serving as a pilot project. In particular, the variation in HDD productivity during the reaming stage is provided based on the soil and project conditions encountered (diameter), while other conditions (e.g., contractor and HDD machine) remain constant.
Factors Affecting Productivity of Horizontal Directional Drilling
Sarireh, Mohmd (author) / Najafi, Mohammad (author) / Slavin, Lawrence (author)
International Conference on Pipelines and Trenchless Technology ; 2012 ; Wuhan, China
ICPTT 2012 ; 1848-1858
2012-11-13
Conference paper
Electronic Resource
English
Subsurface Conditions Affecting Horizontal Directional Drilling
British Library Conference Proceedings | 1993
|Productivity Analysis of Horizontal Directional Drilling
British Library Conference Proceedings | 2009
|Data acquisition and factors impacting productivity of Horizontal Directional Drilling (HDD)
Online Contents | 2013
|Data acquisition and factors impacting productivity of Horizontal Directional Drilling (HDD)
British Library Online Contents | 2013
|