A platform for research: civil engineering, architecture and urbanism
An Account of the Erection of a Draw-Bridge Without False Works
In giving the following I would say, by way of preface, that though the matter may not be of sufficient importance to be made the subject of a formal communication to the Society, or to be embodied in its Transactions, yet the fact that the plan of raising was hastily improvised with only the crudest materials at hand for its execution, may serve as some apology for occupying a portion of your time this evening.
An Account of the Erection of a Draw-Bridge Without False Works
In giving the following I would say, by way of preface, that though the matter may not be of sufficient importance to be made the subject of a formal communication to the Society, or to be embodied in its Transactions, yet the fact that the plan of raising was hastily improvised with only the crudest materials at hand for its execution, may serve as some apology for occupying a portion of your time this evening.
An Account of the Erection of a Draw-Bridge Without False Works
Maurice, C. S. (author)
Transactions of the American Society of Civil Engineers ; 2 ; 330-332
2021-01-01
31874-01-01 pages
Article (Journal)
Electronic Resource
Unknown
An account of the erection of a drawbridge without false works
Engineering Index Backfile | 1873
|Erection of the draw span of the new rock island bridge
Engineering Index Backfile | 1897
|Engineering Index Backfile | 1898
|Seohae Bridge Starter Erection without Pier Bracket
British Library Conference Proceedings | 2001
|Falsework permits erection of bridge without obstructing traffic
Engineering Index Backfile | 1925
|