Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
The purpose of this paper is to propose a methodology to automatically generate CPM schedules for preliminary project planning. This paper mainly focuses on a process of generating CPM activities using automatically calculated durations. Historical labor productivity is utilized as a governing parameter to convey the previous experiences into a new project. Several different adjustment mechanisms are applied in order to enhance the reliability and to reduce the workload. A real-world case of implementing the proposed methodology is introduced in order to evaluate the effectiveness and viability of the method. Managerial issues including strategic significance from a corporate perspective, cost effectiveness for this ad hoc system, and overhead efforts to maintain standardized and structured historical databases are discussed as well.
Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
The purpose of this paper is to propose a methodology to automatically generate CPM schedules for preliminary project planning. This paper mainly focuses on a process of generating CPM activities using automatically calculated durations. Historical labor productivity is utilized as a governing parameter to convey the previous experiences into a new project. Several different adjustment mechanisms are applied in order to enhance the reliability and to reduce the workload. A real-world case of implementing the proposed methodology is introduced in order to evaluate the effectiveness and viability of the method. Managerial issues including strategic significance from a corporate perspective, cost effectiveness for this ad hoc system, and overhead efforts to maintain standardized and structured historical databases are discussed as well.
Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
Jung, Youngsoo (author) / Lee, Young Hwan (author) / Woo, Sungkwon (author) / Yang, Jin-Soo (author) / An, Sang-Mok (author) / Oh, Young-Seok (author) / Lee, Bok Nam (author)
Construction Research Congress 2009 ; 2009 ; Seattle, Washington, United States
Building a Sustainable Future ; 816-825
2009-04-01
Conference paper
Electronic Resource
English
Automated CPM Schedule Generation for Early Project Planning: Methodology and Case Study
British Library Conference Proceedings | 2009
|British Library Online Contents | 1998
|Project schedule compression: a multi-objective methodology
Online Contents | 2013
|Project schedule compression: a multi-objective methodology
British Library Online Contents | 2013
|Schedule Acceleration Planning in Construction Project (Case Study: Japek II Selatan Tollroad)
BASE | 2022
|