Geo-Treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from a Subway Project in Guangzhou, China
This paper presents tunnel construction in caved karst strata base on the metro subway project between Maanshan Park station and Liantangnan station (Ma-Lian section) of Guangzhou metro line No. 9. The karst is highly developed with 98 karst caves along the tunnel route. The soil in the tunnel zone mainly consists of soft residual deposit, sand and slightly weathered limestone, which are unstable during construction. Complicated ground conditions were encountered during tunnel excavation, such as upper-soft-lower-hard ground, sand layer and caved karst. Geological risks including sink holes, water or stone ingress, and damage to constructed tunnels and the shield may occur during tunneling in the project of Ma-Lian section. Construction problems may be encountered during tunneling excavation, such as caved karst treatment and tunneling in complicated ground. Recommended solutions and modifications are proposed to solve the above problems.
Geo-Treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from a Subway Project in Guangzhou, China
This paper presents tunnel construction in caved karst strata base on the metro subway project between Maanshan Park station and Liantangnan station (Ma-Lian section) of Guangzhou metro line No. 9. The karst is highly developed with 98 karst caves along the tunnel route. The soil in the tunnel zone mainly consists of soft residual deposit, sand and slightly weathered limestone, which are unstable during construction. Complicated ground conditions were encountered during tunnel excavation, such as upper-soft-lower-hard ground, sand layer and caved karst. Geological risks including sink holes, water or stone ingress, and damage to constructed tunnels and the shield may occur during tunneling in the project of Ma-Lian section. Construction problems may be encountered during tunneling excavation, such as caved karst treatment and tunneling in complicated ground. Recommended solutions and modifications are proposed to solve the above problems.
Geo-Treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from a Subway Project in Guangzhou, China
Cui, Qing L. (author) / Xu, Ye S. (author) / Shen, Shui L. (author) / Wu, Huai N. (author) / Yin, Zhen Y. (author)
International Symposium on Systematic Approaches to Environmental Sustainability in Transportation ; 2015 ; Fairbanks, Alaska
2015-07-31
Conference paper
Electronic Resource
English
Strata Response Analysis of Subway Tunnel Construction Under Hidden Karst Caves in the Tunnel Arch
DOAJ | 2024
|Central Subway Tunnel Construction Instrumentation: Lessons Learned, San Francisco, California
British Library Conference Proceedings | 2015
|Minimum ground pre-freezing time before excavation of Guangzhou subway tunnel
Online Contents | 2006
|Boston's Central Artery/Tunnel Project—Lessons Learned
British Library Conference Proceedings | 2017
|