A platform for research: civil engineering, architecture and urbanism
City of Duluth, Minnesota Long-Term Street Improvement Program: History, Past Performance, Current Practice, and Future Considerations
This paper continues to document the long-term street reconstruction program in Duluth, Minnesota as previously described in a paper published in 1998 by some of the same authors. The program started in 1993, construction started in 1994. At the completion of the 2001 construction season, 38.5 miles of road have been reconstructed. The 2002 program provides for the reconstruction of an additional 6 miles of road. This program is slated to continue until all 355 miles of city streets have been reconstructed. This paper will discuss the performance of streets in place, expected life cycle costs, current roadway sections, and future modifications to the program.
City of Duluth, Minnesota Long-Term Street Improvement Program: History, Past Performance, Current Practice, and Future Considerations
This paper continues to document the long-term street reconstruction program in Duluth, Minnesota as previously described in a paper published in 1998 by some of the same authors. The program started in 1993, construction started in 1994. At the completion of the 2001 construction season, 38.5 miles of road have been reconstructed. The 2002 program provides for the reconstruction of an additional 6 miles of road. This program is slated to continue until all 355 miles of city streets have been reconstructed. This paper will discuss the performance of streets in place, expected life cycle costs, current roadway sections, and future modifications to the program.
City of Duluth, Minnesota Long-Term Street Improvement Program: History, Past Performance, Current Practice, and Future Considerations
Hinzmann, Jr., John J. (author) / Krzewinski, Thomas G. (author) / Prusak, David J. (author)
11th International Conference on Cold Regions Engineering ; 2002 ; Anchorage, Alaska, United States
Cold Regions Engineering ; 372-381
2002-05-08
Conference paper
Electronic Resource
English
British Library Conference Proceedings | 2002
|City of Duluth Long-Term Street Improvement Program-History
British Library Conference Proceedings | 1998
|Emerson Residence, Duluth, Minnesota - Salmela Architect
Online Contents | 1998
Erection operations for the lake avenue south bridge city of Duluth, Minnesota
Engineering Index Backfile | 1929
|The ferry bridge across the ship canal at Duluth, Minnesota
Engineering Index Backfile | 1905
|