A platform for research: civil engineering, architecture and urbanism
Evaluation of Process Alternatives for City of Temple Terrace Design-Build Water Reclamation Facility
This paper presents conceptual evaluation and life cycle cost analysis for the four liquid process alternatives for the city of Temple Terrace Water Reclamation Facility (TTWRF). The preliminary design for TTWRF is based upon 2.5 MGD annual average, 3.3 MGD max month, to be procured under a design build project delivery process. The hourly peaking factor for the design is 2.75. The Biological Nutrient Removal (BNR) and disinfection processes are the core of the treatment process, with several additional peripheral processes and facilities.
Evaluation of Process Alternatives for City of Temple Terrace Design-Build Water Reclamation Facility
This paper presents conceptual evaluation and life cycle cost analysis for the four liquid process alternatives for the city of Temple Terrace Water Reclamation Facility (TTWRF). The preliminary design for TTWRF is based upon 2.5 MGD annual average, 3.3 MGD max month, to be procured under a design build project delivery process. The hourly peaking factor for the design is 2.75. The Biological Nutrient Removal (BNR) and disinfection processes are the core of the treatment process, with several additional peripheral processes and facilities.
Evaluation of Process Alternatives for City of Temple Terrace Design-Build Water Reclamation Facility
de Silva, Viraj (author) / Motta, Joseph J. (author) / Garcia, Woody (author) / Schaefer, Steve (author)
World Water and Environmental Resources Congress 2004 ; 2004 ; Salt Lake City, Utah, United States
2004-06-25
Conference paper
Electronic Resource
English
Alternatives Analysis Approach to Abandoned Mine Reclamation Design
British Library Conference Proceedings | 2010
|Alternatives Analysis Approach to Abandoned Mine Reclamation Design
British Library Conference Proceedings | 2010
|South Hutchinson Island Water Reclamation Facility
British Library Conference Proceedings | 1998
|TIBKAT | 2005
|Selecting the Right Treatment Process for a new Water Reclamation Facility
British Library Conference Proceedings | 2012
|