A platform for research: civil engineering, architecture and urbanism
Construction of the Columbia River (Portland-Vancouver) Bridges
Reconstruction of 13 span steel structure of existing East bridge which will be modernized, and elevated; construction of new parallel 11 span West bridge which will carry three southbound lanes; precast shell type construction of piers; details of 1.34 mi toll project and Oregon Slough bridge modernization.
Construction of the Columbia River (Portland-Vancouver) Bridges
Reconstruction of 13 span steel structure of existing East bridge which will be modernized, and elevated; construction of new parallel 11 span West bridge which will carry three southbound lanes; precast shell type construction of piers; details of 1.34 mi toll project and Oregon Slough bridge modernization.
Construction of the Columbia River (Portland-Vancouver) Bridges
Merchant, I. D. (author)
Journal of the Construction Division ; 85 ; 37-50
2021-01-01
141959-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Construction of Columbia river (Portland-Vancouver) bridges
Engineering Index Backfile | 1959
|New bridges at Vancouver, British Columbia
Engineering Index Backfile | 1913
Engineering Index Backfile | 1915
Vancouver meeting of civil engineers centers on Columbia river
Engineering Index Backfile | 1934
The bridging of the Columbia and Willamette rivers between Vancouver, Wash., and Portland, Ore.
Engineering Index Backfile | 1908
|