A platform for research: civil engineering, architecture and urbanism
Rehabilitation of Concrete Pavement
Describes planning and performance of the restoration of profile of a 7-mile (11.3-km) section of concrete pavement on an interstate highway. Includes data on analysis and execution of traffic control, lane closures, and project planning as well as actual performance of the work. Extensive leveling by slabjacking (pressure grouting) as well as removal and replacement of pavement sections is examined in detail. Work was performed at night and on weekends. Satisfactory replacement concrete was obtained utilizing Type III cement and a 12-hr cure period.
Rehabilitation of Concrete Pavement
Describes planning and performance of the restoration of profile of a 7-mile (11.3-km) section of concrete pavement on an interstate highway. Includes data on analysis and execution of traffic control, lane closures, and project planning as well as actual performance of the work. Extensive leveling by slabjacking (pressure grouting) as well as removal and replacement of pavement sections is examined in detail. Work was performed at night and on weekends. Satisfactory replacement concrete was obtained utilizing Type III cement and a 12-hr cure period.
Rehabilitation of Concrete Pavement
Warner, James (author) / Fera, Tom (author)
Journal of the Construction Division ; 103 ; 395-403
2021-01-01
91977-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Pavement Rehabilitation Using Fractured Concrete Pavement Techniques
British Library Conference Proceedings | 2006
|Concrete Pavement Rehabilitation-Georgia Methodology
British Library Conference Proceedings | 1981
|Concrete overlays for pavement rehabilitation summary
British Library Conference Proceedings | 2012
|