Construction Planning for Linear Projects
A method is proposed for planning the construction process for a linear project consisting of a series of production lines, each of which comprises a series of sequential activities (e.g., pipelines, roads, bridges, etc.). The method is based on an input including labor requirement for each activity and the feasible crew sizes for each production line. Dynamic programming is used for determination of the quantity of resources (therefore also activity durations) per line and the start time of each activity, with a view to work continuity within the line and to minimum overall project duration.
Construction Planning for Linear Projects
A method is proposed for planning the construction process for a linear project consisting of a series of production lines, each of which comprises a series of sequential activities (e.g., pipelines, roads, bridges, etc.). The method is based on an input including labor requirement for each activity and the feasible crew sizes for each production line. Dynamic programming is used for determination of the quantity of resources (therefore also activity durations) per line and the start time of each activity, with a view to work continuity within the line and to minimum overall project duration.
Construction Planning for Linear Projects
Selinger, Shlomo (author)
Journal of the Construction Division ; 106 ; 195-205
2021-01-01
111980-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Planning city construction projects
Engineering Index Backfile | 1943
|Cost Planning of Construction Projects
Wiley | 2015
|Critical planning processes in construction projects
British Library Online Contents | 2009
|