A platform for research: civil engineering, architecture and urbanism
Construction of Rocky Reach Hydroelectric Project
4800 ft long dam consists of 450 ft gravity section on west bank, 1100 ft powerhouse section, 375 ft arch section, and 750 ft spillway section in river bed, and 120 ft gravity section and 2000 ft earth dam section on east bank; river diversion, 5,000,0000 cu yd excavations, and 1,000,000 cu yd concreting work; fish ladder at west bank and fish passage along entire river bed section; plant will produce 1.215 Mw by 11 units.
Construction of Rocky Reach Hydroelectric Project
4800 ft long dam consists of 450 ft gravity section on west bank, 1100 ft powerhouse section, 375 ft arch section, and 750 ft spillway section in river bed, and 120 ft gravity section and 2000 ft earth dam section on east bank; river diversion, 5,000,0000 cu yd excavations, and 1,000,000 cu yd concreting work; fish ladder at west bank and fish passage along entire river bed section; plant will produce 1.215 Mw by 11 units.
Construction of Rocky Reach Hydroelectric Project
Evans, W. N. (author) / Boyd, J. H. (author)
Journal of the Construction Division ; 86 ; 45-66
2021-01-01
221960-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Construction of Rocky Reach Hydroelectric Project
ASCE | 2021
|SPECIAL REPORT: SPOTLIGHT ON ROCKY REACH HYDROELECTRIC PROJECT
Online Contents | 1997
SPECIAL REPORT: SPOTLIGHT ON ROCKY REACH HYDROELECTRIC PROJECT
Online Contents | 1997
Tainter Gate Testing and Evaluation - Rocky Reach Hydroelectric Project
British Library Conference Proceedings | 2005
|