A platform for research: civil engineering, architecture and urbanism
Tied Together
The replacement of the John Greenleaf Whittier Memorial Bridge was one of the signature projects of the Massachusetts Department of Transportation’s $3-billion accelerated bridge construction program. The network tied arch structural system selected for the main span of the new northbound and southbound structures that the bridge comprises was a novel solution developed to overcome significant construction challenges.
Tied Together
The replacement of the John Greenleaf Whittier Memorial Bridge was one of the signature projects of the Massachusetts Department of Transportation’s $3-billion accelerated bridge construction program. The network tied arch structural system selected for the main span of the new northbound and southbound structures that the bridge comprises was a novel solution developed to overcome significant construction challenges.
Tied Together
Wollmann, Gregor (author) / Briggs, Lisa (author) / Kiriakidis, Savas (author) / Daigle, Chris (author)
Civil Engineering Magazine Archive ; 89 ; 64-75
2020-01-01
122019-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Two 23-story buildings tied together
Engineering Index Backfile | 1950
Interlocking blocks tied together make concrete chimney
Engineering Index Backfile | 1917
|British Library Online Contents | 1998
|Wiley | 2006
|Online Contents | 1998
|