A platform for research: civil engineering, architecture and urbanism
Scheduled to begin full-scale operations this September, the 36 mgd Brightwater Treatment System is one of the most advanced in the nation. Upon completion, the $1.8-billion project, which also includes a 13 mi long conveyance system, will ensure that King County, Washington, is securely positioned to meet the needs of its residents and businesses and protect water quality well into the foreseeable future.
Scheduled to begin full-scale operations this September, the 36 mgd Brightwater Treatment System is one of the most advanced in the nation. Upon completion, the $1.8-billion project, which also includes a 13 mi long conveyance system, will ensure that King County, Washington, is securely positioned to meet the needs of its residents and businesses and protect water quality well into the foreseeable future.
Brightwater Prepares to Shine
Landers, Jay (author)
Civil Engineering Magazine Archive ; 82 ; 58-83
2016-01-01
262012-01-01 pages
Article (Journal)
Electronic Resource
Unknown
British Library Online Contents | 2012
|Brightwater East-A Case History
British Library Conference Proceedings | 2009
|BRIGHTWATER - Finding solutions in Seattle
Online Contents | 2009
Design of the Brightwater Conveyance Tunnels
British Library Conference Proceedings | 2005
|Exploration Decision Analyses for the Brightwater Tunnels
British Library Conference Proceedings | 2005
|