Construction Methods and Plant Layout at Coolidge Dam, In Arizona
In planning his procedure for building the Coolidge Dam on the San Carlos Project, Arizona, the contractor was faced with unusual difficulties as to plant selection and the choice of handling methods. There were three main groups of problems involved in laying out the construction plant: (1) Concrete; (2), excavation; and (3) general service problems that applied to both excavation and concrete.
Construction Methods and Plant Layout at Coolidge Dam, In Arizona
In planning his procedure for building the Coolidge Dam on the San Carlos Project, Arizona, the contractor was faced with unusual difficulties as to plant selection and the choice of handling methods. There were three main groups of problems involved in laying out the construction plant: (1) Concrete; (2), excavation; and (3) general service problems that applied to both excavation and concrete.
Construction Methods and Plant Layout at Coolidge Dam, In Arizona
Tripp, J. G. (author)
Transactions of the American Society of Civil Engineers ; 95 ; 159-168
2021-01-01
101931-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Construction methods and plant layout at Coolidge dam, in Arizona
Engineering Index Backfile | 1929
|Construction methods and plant layout at Coolidge Dam, in Arizona
Engineering Index Backfile | 1931
|Construction methods and plant layout for coolidge dam in Arizona
Engineering Index Backfile | 1930
|