A platform for research: civil engineering, architecture and urbanism
Accelerated Construction of Short Span Railroad Bridges in Iran
A comparison is made between the three conventional methods used for accelerated bridge construction (ABC) of railroad bridges in Iran: single-piece deck installation by heavy cranes, multisegment deck installation by cranes, and single-piece deck installation by the so-called roll-in or sliding method. Both the safety of the construction and the serviceability of the railway line during the construction process are the main factors influencing the appropriate alternatives. Four railroad bridge construction case studies are demonstrated and compared here. Based on the individual situations, it is shown that the use of the roll-in method, in comparison with installation by crane, can reduce the installation costs significantly, eliminate the fatigue-prone details of the steel connectors, and eliminate the time for concrete casting in conventional multisegment deck installations.
Accelerated Construction of Short Span Railroad Bridges in Iran
A comparison is made between the three conventional methods used for accelerated bridge construction (ABC) of railroad bridges in Iran: single-piece deck installation by heavy cranes, multisegment deck installation by cranes, and single-piece deck installation by the so-called roll-in or sliding method. Both the safety of the construction and the serviceability of the railway line during the construction process are the main factors influencing the appropriate alternatives. Four railroad bridge construction case studies are demonstrated and compared here. Based on the individual situations, it is shown that the use of the roll-in method, in comparison with installation by crane, can reduce the installation costs significantly, eliminate the fatigue-prone details of the steel connectors, and eliminate the time for concrete casting in conventional multisegment deck installations.
Accelerated Construction of Short Span Railroad Bridges in Iran
Akbari, Reza (author)
2018-10-08
Article (Journal)
Electronic Resource
Unknown
Short-span bridges on the Baltimore and Ohio railroad
Engineering Index Backfile | 1906
Construction of short span railway bridges
Engineering Index Backfile | 1898
|Orthotropic-plate construction for short-span bridges
Engineering Index Backfile | 1961
|The construction of culverts and short span bridges
Engineering Index Backfile | 1916