A platform for research: civil engineering, architecture and urbanism
Flood-Control Operation of Tennessee Valley Authority Reservoirs
This paper describes the actual flood conditions and actual and alternative hypothetical operations of the tributary and main-river reservoirs during these floods. Reductions in peak stage and discharge at each dam and at critical points are tabulated, and comparisons are made between 'the actual crest reductions and possible reductions if other methods of operation had been followed.
Flood-Control Operation of Tennessee Valley Authority Reservoirs
This paper describes the actual flood conditions and actual and alternative hypothetical operations of the tributary and main-river reservoirs during these floods. Reductions in peak stage and discharge at each dam and at critical points are tabulated, and comparisons are made between 'the actual crest reductions and possible reductions if other methods of operation had been followed.
Flood-Control Operation of Tennessee Valley Authority Reservoirs
Rutter, Edward J. (author)
Transactions of the American Society of Civil Engineers ; 116 ; 671-703
2021-01-01
331951-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Flood-control operation on Tennessee valley authority reservoirs
Engineering Index Backfile | 1950
|Flood-control operation of Tennessee valley authority
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1939
Foundation experiences, Tennessee Valley Authority
Engineering Index Backfile | 1940
Foundation experiences, Tennessee valley authority
Engineering Index Backfile | 1940