A platform for research: civil engineering, architecture and urbanism
Coordination and Production Planning for Mechanical, Electrical and Plumbing Construction
Technical systems in buildings are typically designed independently by specialty engineers and contractors. Before construction begins, the dimensions and configurations of systems must be evaluated to ensure they will fit into spaces provided between structural and architectural building systems. This process is known as Mechanical, Electrical, and Plumbing Coordination. While the obvious benefit of coordination is that field conflicts are reduced during construction, this process is often not managed effectively. As a result, mistakes are made that result in field conflicts, or the coordination process drags on too long and delays the project with adverse effects on production. This paper discusses coordination as a critical part-of the construction process, the benefits of coordinating work before it is permitted to proceed, and effective techniques for performing coordination on building projects. Case studies of mechanically intensive building projects are provided to demonstrate the costs and benefits of coordination, the methods of effective coordination management, and the impact of avoidable interference problems on production and project costs. Key elements of a successful coordination process are identified based on case study results.
Coordination and Production Planning for Mechanical, Electrical and Plumbing Construction
Technical systems in buildings are typically designed independently by specialty engineers and contractors. Before construction begins, the dimensions and configurations of systems must be evaluated to ensure they will fit into spaces provided between structural and architectural building systems. This process is known as Mechanical, Electrical, and Plumbing Coordination. While the obvious benefit of coordination is that field conflicts are reduced during construction, this process is often not managed effectively. As a result, mistakes are made that result in field conflicts, or the coordination process drags on too long and delays the project with adverse effects on production. This paper discusses coordination as a critical part-of the construction process, the benefits of coordinating work before it is permitted to proceed, and effective techniques for performing coordination on building projects. Case studies of mechanically intensive building projects are provided to demonstrate the costs and benefits of coordination, the methods of effective coordination management, and the impact of avoidable interference problems on production and project costs. Key elements of a successful coordination process are identified based on case study results.
Coordination and Production Planning for Mechanical, Electrical and Plumbing Construction
Riley, David (author)
Construction Congress VI ; 2000 ; Orlando, Florida, United States
Construction Congress VI ; 690-700
2000-02-14
Conference paper
Electronic Resource
English
Coordination and Production Planning for Mechanical, Electrical, and Plumbing Construction
British Library Conference Proceedings | 2000
|Mechanical, electrical and plumbing coordination practices: case Finnish construction market
TIBKAT | 2022
|Prototype Tool for Mechanical Electrical, and Plumbing Coordination
British Library Online Contents | 2006
|