A platform for research: civil engineering, architecture and urbanism
Early Warning Dashboard for Advanced Construction Planning Metrics
With the advancement of technology and computer-based tools, the methods employed in planning and control of construction projects are becoming more potent. Throughout this technological evolvement, researchers have introduced several metrics to guide planners in their assessment of project performance and control as the project progresses. However, construction projects still encounter failures as a result of planning deficiencies. This raises concerns regarding the capability of the current control mechanisms in alarming planners or practitioners and generating an early warning system to guide future actions. This research proposes a new dashboard system based on advanced metrics to address several project performance areas that are currently partially measured. The dashboard is expected to better describe, monitor, and control the various dynamic aspects of construction planning within the last planner system for production control. Applying the dashboard on data from two construction projects in the U.S. revealed the ability to assess project performance areas beyond the capacity of previously available planning metrics.
Early Warning Dashboard for Advanced Construction Planning Metrics
With the advancement of technology and computer-based tools, the methods employed in planning and control of construction projects are becoming more potent. Throughout this technological evolvement, researchers have introduced several metrics to guide planners in their assessment of project performance and control as the project progresses. However, construction projects still encounter failures as a result of planning deficiencies. This raises concerns regarding the capability of the current control mechanisms in alarming planners or practitioners and generating an early warning system to guide future actions. This research proposes a new dashboard system based on advanced metrics to address several project performance areas that are currently partially measured. The dashboard is expected to better describe, monitor, and control the various dynamic aspects of construction planning within the last planner system for production control. Applying the dashboard on data from two construction projects in the U.S. revealed the ability to assess project performance areas beyond the capacity of previously available planning metrics.
Early Warning Dashboard for Advanced Construction Planning Metrics
Hamzeh, Farook (author) / Ezzeddine, Ali (author) / Shehab, Lynn (author) / Khalife, Salam (author) / El-Samad, Ghali (author) / Emdanat, Samir (author)
Construction Research Congress 2020 ; 2020 ; Tempe, Arizona
2020-11-09
Conference paper
Electronic Resource
English
Advanced Metrics for Construction Planning
ASCE | 2019
|Gaining Dual Benefits by Leveraging Synergies Among Components for Early Warning System Dashboard
British Library Conference Proceedings | 2011
|Safety early warning device for urban planning road construction
European Patent Office | 2024
|Road construction early warning device and road construction early warning system
European Patent Office | 2022
|Project Dashboard: Concurrent Visual Representation Method of Project Metrics on 3D Building Models
British Library Conference Proceedings | 2005
|