A platform for research: civil engineering, architecture and urbanism
New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston
This new North Parallel Runway complex costs approximately $300 million, including land acquisition of 1,500 acres costing approximately $100 million. This runway 8L-26R is 5000 feet north of the existing Runway 8R-26L in order to facilitate simultaneous landings on both runways. This runway will be 9000 feet long by 150 feet wide with 35-foot wide shoulders on each side. This runway will have an ILS category III on both ends.
New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston
This new North Parallel Runway complex costs approximately $300 million, including land acquisition of 1,500 acres costing approximately $100 million. This runway 8L-26R is 5000 feet north of the existing Runway 8R-26L in order to facilitate simultaneous landings on both runways. This runway will be 9000 feet long by 150 feet wide with 35-foot wide shoulders on each side. This runway will have an ILS category III on both ends.
New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston
Godiwalla, Adil (author)
Airfield Pavements Specialty Conference 2003 ; 2003 ; Las Vegas, Nevada, United States
Airfield Pavements ; 66-72
2004-02-06
Conference paper
Electronic Resource
English
New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston
British Library Conference Proceedings | 2003
|Whitetopping of Runway 15R-33L and New Taxiway: Bush Intercontinental Airport, Houston, Texas
British Library Conference Proceedings | 2000
|Rehabilitation of Runway 9-27 at Intercontinental Airport of Houston (IAH)
British Library Conference Proceedings | 2000
|North Ramp Pavement Evaluation/Rehabilitation, Houston Intercontinental Airport
British Library Conference Proceedings | 1993
|