A platform for research: civil engineering, architecture and urbanism
Condition Assessment of 60-Inch PCCP in Houston, TX
On October 13, 2002, an existing 60-inch Prestressed Concrete Cylinder Pipe (PCCP) water transmission main, constructed in the mid 1970s, suffered a catastrophic failure near the intersection of Clay and Cullen immediately east of downtown Houston. The recent failure raises concerns about the water main's long-term performance and structural integrity. The nature of some PCCP failures is the instant release of a large quantity of water resulting in significant damage to the surrounding area, as realized on October 13th.
Condition Assessment of 60-Inch PCCP in Houston, TX
On October 13, 2002, an existing 60-inch Prestressed Concrete Cylinder Pipe (PCCP) water transmission main, constructed in the mid 1970s, suffered a catastrophic failure near the intersection of Clay and Cullen immediately east of downtown Houston. The recent failure raises concerns about the water main's long-term performance and structural integrity. The nature of some PCCP failures is the instant release of a large quantity of water resulting in significant damage to the surrounding area, as realized on October 13th.
Condition Assessment of 60-Inch PCCP in Houston, TX
Ortega, Rafael (author) / Henry, Gregory J. (author) / Green, Robin S. (author)
Pipeline Engineering and Construction International Conference 2003 ; 2003 ; Baltimore, Maryland, United States
2003-07-08
Conference paper
Electronic Resource
English
The Need to Proceed Condition Assessment of 60-inch PCCP in Houston, Texas
British Library Conference Proceedings | 2009
|Condition Assessment of 60-Inch Prestressed Concrete Cylinder Pipe (PCCP) in Houston, TX
British Library Conference Proceedings | 2003
|Fast-Track Repair of 42-Inch PCCP Water Main: Houston, Texas
British Library Conference Proceedings | 2005
|Fast-Track Repair of 42-inch PCCP Water Main in Houston, TX
British Library Conference Proceedings | 2007
|