A platform for research: civil engineering, architecture and urbanism
Adjustments Toward Equilibrium of a Large Flood-Tidal Delta After a Major Dredging Program, Tauranga Harbour, New Zealand
The Port of Tauranga is located within a tidal inlet estuarine lagoon system which has been dredged to improve navigation for shipping since 1968. In 1992 a major dredging program deepened the entrance navigation channel through the ebb-tidal delta from 10 to 14 m, and the inner harbor channels to ~13 m. As a condition of the consent to dredge a detailed monitoring program was required which included annual hydrographic surveys over the flood and ebb-tidal delta as well as recording current meter records from morphodynamically sensitive locations to compare with records taken before the dredging. Results of the hydrographic surveys showed significant morphodynamic change of the flood-tidal delta had occurred essentially by the time the 6 month dredging program was completed. Comparison of the S4 current meter recordings showed current changes consistent with expectations of the EIA. Changes on the ebb-tidal delta were not expected but have occurred although not as rapidly, and seem to be ongoing.
Adjustments Toward Equilibrium of a Large Flood-Tidal Delta After a Major Dredging Program, Tauranga Harbour, New Zealand
The Port of Tauranga is located within a tidal inlet estuarine lagoon system which has been dredged to improve navigation for shipping since 1968. In 1992 a major dredging program deepened the entrance navigation channel through the ebb-tidal delta from 10 to 14 m, and the inner harbor channels to ~13 m. As a condition of the consent to dredge a detailed monitoring program was required which included annual hydrographic surveys over the flood and ebb-tidal delta as well as recording current meter records from morphodynamically sensitive locations to compare with records taken before the dredging. Results of the hydrographic surveys showed significant morphodynamic change of the flood-tidal delta had occurred essentially by the time the 6 month dredging program was completed. Comparison of the S4 current meter recordings showed current changes consistent with expectations of the EIA. Changes on the ebb-tidal delta were not expected but have occurred although not as rapidly, and seem to be ongoing.
Adjustments Toward Equilibrium of a Large Flood-Tidal Delta After a Major Dredging Program, Tauranga Harbour, New Zealand
Healy, Terry (author) / Mathew, Joseph (author) / de Lange, Willem (author) / Black, Kerry (author)
25th International Conference on Coastal Engineering ; 1996 ; Orlando, Florida, United States
Coastal Engineering 1996 ; 3284-3294
1997-08-05
Conference paper
Electronic Resource
English
British Library Conference Proceedings | 1997
|Ebb-tidal Delta Response to Shipping Channel Dredging, Tauranga, New Zealand
British Library Conference Proceedings | 1997
|Ebb-tidal Delta Response to Shipping Channel Dredging, Tauranga, New Zealand
British Library Conference Proceedings | 1997
|TAURANGA HARBOUR LINK WINS 2010 SUPREME CONCRETE SUSTAINABILITY AWARD
British Library Online Contents | 2010
Resin Acids in Storm Runoff From a Major Timber Port, Tauranga, New Zealand
British Library Conference Proceedings | 1997
|