A platform for research: civil engineering, architecture and urbanism
An Initial Pilot Scale Geophysical Investigation of a Waste Disposal Site in Kuwait
In this pilot scale study, a surface geophysical investigation consisting of four-electrode electrical resistivity survey technique was carried out on Al-Jahra waste disposal site. This dumpsite, situated very close to a highly populated area, was decommissioned April of 2007 after twenty years of service. The dumpsite was reactivated in August of 2007 and is currently receiving construction, household and agricultural waste streams. This paper presents the preliminary results of the geophysical surveys carried out. The results indicated a complex structure in the subsurface with high resistivity values extending into greater depths in the NW corner of the study area. The depth at which high electrical resistivity was detected coincided with the excavation depth according to plans held by the local municipality. The findings also indicated the absence of leachate at the excavation depth. Such findings were verified by means of physical field-testing. Three boreholes were drilled at the study site for this purpose.
An Initial Pilot Scale Geophysical Investigation of a Waste Disposal Site in Kuwait
In this pilot scale study, a surface geophysical investigation consisting of four-electrode electrical resistivity survey technique was carried out on Al-Jahra waste disposal site. This dumpsite, situated very close to a highly populated area, was decommissioned April of 2007 after twenty years of service. The dumpsite was reactivated in August of 2007 and is currently receiving construction, household and agricultural waste streams. This paper presents the preliminary results of the geophysical surveys carried out. The results indicated a complex structure in the subsurface with high resistivity values extending into greater depths in the NW corner of the study area. The depth at which high electrical resistivity was detected coincided with the excavation depth according to plans held by the local municipality. The findings also indicated the absence of leachate at the excavation depth. Such findings were verified by means of physical field-testing. Three boreholes were drilled at the study site for this purpose.
An Initial Pilot Scale Geophysical Investigation of a Waste Disposal Site in Kuwait
Al-Fares, R. A. (author) / Al-Jarallah, R. S. (author)
Geo-Frontiers Congress 2011 ; 2011 ; Dallas, Texas, United States
Geo-Frontiers 2011 ; 2534-2543
2011-03-11
Conference paper
Electronic Resource
English
An Initial Pilot Scale Geophysical Investigation of a Waste Disposal Site in Kuwait
British Library Conference Proceedings | 2011
|Characterization of landfill leachates at a waste disposal site in Kuwait
Online Contents | 1995
|Bellville South waste disposal site
British Library Online Contents | 2002
Solid-Waste-Disposal Site Location
Online Contents | 1995
|