A platform for research: civil engineering, architecture and urbanism
Replacement of the Third Avenue Bridge Over the Harlem River
The replacement of the 105-year old Third Avenue Swing Bridge is complete. The new 5-lane crossing will consist of 17 approach spans and a 350-ft long swing span for an overall bridge length of 1500 feet. Including on-grade approaches, the overall project length is 3500 feet. The scheme selected is an on-line replacement, requiring complex staged construction that includes a temporary bridge and float-in of the fully-assembled swing span, which has been barged roughly 1800 miles to New York City from Alabama.
Replacement of the Third Avenue Bridge Over the Harlem River
The replacement of the 105-year old Third Avenue Swing Bridge is complete. The new 5-lane crossing will consist of 17 approach spans and a 350-ft long swing span for an overall bridge length of 1500 feet. Including on-grade approaches, the overall project length is 3500 feet. The scheme selected is an on-line replacement, requiring complex staged construction that includes a temporary bridge and float-in of the fully-assembled swing span, which has been barged roughly 1800 miles to New York City from Alabama.
Replacement of the Third Avenue Bridge Over the Harlem River
Coates, Andrew C. (author) / Bluni, Sean A. (author) / Connolly, Paul J. (author)
Structures Congress 2005 ; 2005 ; New York, New York, United States
Structures Congress 2005 ; 1-12
2005-04-18
Conference paper
Electronic Resource
English
Replacement of the Third Avenue Bridge over the Harlem River
British Library Conference Proceedings | 2005
|The Third Avenue Bridge over the Harlem River
Engineering Index Backfile | 1893
Temporary bridge over the Harlem River
Engineering Index Backfile | 1892
|Lift bridge over the Harlem River
Engineering Index Backfile | 1892
The Lexington avenue subway four-track tunnel under the Harlem river
Engineering Index Backfile | 1913