A platform for research: civil engineering, architecture and urbanism
Geotechnical Aspects of the St. Louis-Lambert International Airport Expansion
This paper discusses a major construction project at St. Louis-Lambert International Airport where a new parallel runway with two taxiways was constructed as part of the airport expansion. The paper focuses on the geotechnical aspects of the project, which included time issues (construction expedients), use of chemical additives, slope stability, settlement, and subgrade stabilization. One of the unique challenges of the project was that cuts and fills of up to 30 meters were made as part of the grading for the runway platform and involved moving approximately 12 million cubic meters of soil. In addition, the cut was almost entirely below the groundwater table. The project also involved construction of the first highway tunnel in the state of Missouri.
Geotechnical Aspects of the St. Louis-Lambert International Airport Expansion
This paper discusses a major construction project at St. Louis-Lambert International Airport where a new parallel runway with two taxiways was constructed as part of the airport expansion. The paper focuses on the geotechnical aspects of the project, which included time issues (construction expedients), use of chemical additives, slope stability, settlement, and subgrade stabilization. One of the unique challenges of the project was that cuts and fills of up to 30 meters were made as part of the grading for the runway platform and involved moving approximately 12 million cubic meters of soil. In addition, the cut was almost entirely below the groundwater table. The project also involved construction of the first highway tunnel in the state of Missouri.
Geotechnical Aspects of the St. Louis-Lambert International Airport Expansion
Berry, Kenneth M. (author) / Hasan, Ahmad (author) / Cooling, Thomas L. (author)
29th International Air Transport Conference ; 2007 ; Irving, Texas, United States
Aviation ; 197-204
2007-08-17
Conference paper
Electronic Resource
English
Geotechnical Aspects of the St. Louis-Lambert International Airport Expansion
British Library Conference Proceedings | 2007
|Plan for Lambert-St. Louis Airport
Engineering Index Backfile | 1945
Case Study: Runway 12L-30R Keel Section Rehabilitation, Lambert-St. Louis International Airport
British Library Conference Proceedings | 2006
|British Library Conference Proceedings | 2006
|