A platform for research: civil engineering, architecture and urbanism
Planning-Level Capital Cost Estimates for Pumping
In planning and optimization studies, engineers are often asked to provide cost estimates for facilities without have knowledge of details of the design. This paper presents a summary of published cost equations for water and wastewater pumping stations with some recommendations for application. In general, because of economies of scale, these cost equations are not linear.
Planning-Level Capital Cost Estimates for Pumping
In planning and optimization studies, engineers are often asked to provide cost estimates for facilities without have knowledge of details of the design. This paper presents a summary of published cost equations for water and wastewater pumping stations with some recommendations for application. In general, because of economies of scale, these cost equations are not linear.
Planning-Level Capital Cost Estimates for Pumping
Walski, Thomas M. (author)
Journal of Water Resources Planning and Management ; 138 ; 307-310
2011-05-13
42012-01-01 pages
Article (Journal)
Electronic Resource
English
Planning-Level Capital Cost Estimates for Pumping
Online Contents | 2012
|Planning-Level Capital Cost Estimates for Pumping
British Library Online Contents | 2012
|Cost of Speed: Analysis of Capital Cost Estimates for High-Speed Ground Transportation Systems
British Library Online Contents | 1997
|GIS-Based Cost Estimates Integrating with Material Layout Planning
British Library Online Contents | 2001
|