PCIM: Project Control and Inhibiting-Factors Management Model
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model.
PCIM: Project Control and Inhibiting-Factors Management Model
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model.
PCIM: Project Control and Inhibiting-Factors Management Model
Olawale, Yakubu (author) / Sun, Ming (author)
Journal of Management in Engineering ; 29 ; 60-70
2012-02-21
112013-01-01 pages
Article (Journal)
Electronic Resource
English
PCIM: Project Control and Inhibiting-Factors Management Model
Online Contents | 2013
|PCIM Europe Conference 2015: 3 Tage, 3 Keynotes
British Library Conference Proceedings | 2015
PCIM Europe 2016 - die Konferenz: Von Basics und Trendthemen
British Library Conference Proceedings | 2016
Deploying Total Quality Management on Construction Sites: Inhibiting Factors
Taylor & Francis Verlag | 2003
|