A platform for research: civil engineering, architecture and urbanism
Maximum Load Capacity of Bailey Bridges
Full-scale ultimate capacity tests of the Bailey bridge by the Research and Development Laboratories of the Corps of Engineers, United States Army, in 1944, provided basic data for determining the capacity of the structure. This paper explains how the test results were used to determine the maximum military loads that could cross various types of Bailey bridges. This method, developed as a result of the ultimate capacity tests, represents a departure from the strictly analytical methods generally used to determine the capacities of bridges. For the most part, maximum load capacities were increased as a result of the investigation.
Maximum Load Capacity of Bailey Bridges
Full-scale ultimate capacity tests of the Bailey bridge by the Research and Development Laboratories of the Corps of Engineers, United States Army, in 1944, provided basic data for determining the capacity of the structure. This paper explains how the test results were used to determine the maximum military loads that could cross various types of Bailey bridges. This method, developed as a result of the ultimate capacity tests, represents a departure from the strictly analytical methods generally used to determine the capacities of bridges. For the most part, maximum load capacities were increased as a result of the investigation.
Maximum Load Capacity of Bailey Bridges
Stegmaier, Robert B. (author)
Transactions of the American Society of Civil Engineers ; 116 ; 930-939
2021-01-01
101951-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Maximum load capacity of bailey bridges
Engineering Index Backfile | 1951
|Maximum load capacity of Bailey bridges
Engineering Index Backfile | 1950
|Testing bailey bridges to failure
Engineering Index Backfile | 1946
|Experimental Investigations of Bailey Bridges
Online Contents | 2003
|Closure to “Stegmaier on Bailey Bridges”
ASCE | 2021
|